LPA|A Architects
Doherty Memorial High School rendering

$293 million Doherty Memorial High School breaks ground in Worcester, Mass.

Nov. 4, 2021
The facility will replace the existing Doherty Memorial High School, which was built in 1966.

Construction has begun on a $293 million Doherty Memorial High School in Worcester, Mass. 

The 426,000-square-foot facility will replace the existing 55-year-old school as well as two closing schools — Worcester Classical and Worcester Commerce high schools, reports The Telegram & Gazette

The new building will have a theater, an auditorium with over 800 seats and a 18,000-square-foot gymnasium.

The school will have green design features that include 1,776 rooftop solar panels.

The school is expected to open in August 2024. 

LPA|A Architects designed the facility and Fontaine + DIMEO is the contractor. 

Sponsored Recommendations

Latest from New Construction

Cache County School District/Design West Architects

Sponsored