SmithGroupJJR
Rendering of the Integrative Genomics Building, which will be built at the Lawrence Berkeley Laboratory.

Lawrence Berkeley Lab breaks ground on new facility

Feb. 9, 2017
The Integrative Genomics Building will bring together researchers from the Department of Energy Joint Genome Institute and the Systems Biology Knowledgebase.

The Lawrence Berkeley National Laboratory in Berkeley, Calif, has broken ground on the Integrative Genomics Building (IGB).

The facility, a Department of Energy lab managed by the University of California, will bring together under one roof researchers from the Department of Energy Joint Genome Institute and the Systems Biology Knowledgebase.

The estimated cost of the IGB project is $91.5 million and is supported through the Science Laboratories Infrastructure (SLI) program. SLI’s mission includes supporting scientific and technological innovation. Through this program, the Department of Energy ensures that its laboratories have state-of-the-art facilities and utilities that are flexible, reliable, and sustainable, with environmentally stable research space and high performance computing space needed to support scientific discovery.

When completed, the IGB will house about 300 scientists and support staff in a four-story building with about 77,000 gross square feet.

The building is designed to use just 35 percent of the energy used by Joint Genome Institute at its existing facility. The IGB design also includes a solar photovoltaic array that will offset more than 10 percent of the building’s energy use. The facility will use electric heat pumps and recovery instead of natural gas to provide heat. The new facility also will be the first at Berkeley Lab with all-LED lighting.

Designers are aiming to receive a LEED Gold rating for the building's sustainable and energy-efficient elements.

The architect is SmithGroupJJR.

Sponsored Recommendations

Providing solutions that help creativity, collaboration, and communication.

Discover why we’re a one-stop shop for all things education. See how ODP Business Solutions can help empower your students, school, and district to succeed by supporting healthier...

Building Futures: Transforming K–12 Learning Environments for Tomorrow's Leaders

Discover how ODP Business Solutions® Workspace Interiors partnered with a pioneering school system, overcoming supply chain challenges to furnish 18 new K–12 campuses across 4...

How to design flexible learning spaces that teachers love and use

Unlock the potential of flexible learning spaces with expert guidance from school districts and educational furniture providers. Discover how to seamlessly integrate adaptive ...

Blurring the Lines in Education Design: K–12 to Higher Ed to Corporate America

Discover the seamless integration of educational and corporate design principles, shaping tomorrow's leaders from kindergarten to boardroom. Explore innovative classroom layouts...