Video: UC Berkeley’s Grimes Engineering Center showcases adaptive reuse and seismic innovation
The University of California, Berkeley’s Grimes Engineering Center demonstrates how adaptive reuse can transform an aging campus facility into a modern hub for learning, collaboration, and innovation.
Designed by Skidmore, Owings & Merrill (SOM), the project reimagines the original 1980 Bechtel Engineering Center by incorporating a two-story glass-and-steel pavilion above the existing structure. The renovation and expansion preserve much of the original building while introducing light-filled gathering spaces, student services, and flexible areas for academic and community activities.
The project also incorporates an innovative seismic-resilience system using shape-memory alloy cables designed to help the structure recover its position following an earthquake. By retaining and repurposing existing building components, the design achieved a more than 42% reduction in embodied carbon emissions compared with a comparable demolition-and-new-construction approach.
Explore how the Grimes Engineering Center, completed in 2025, brings together sustainable campus planning, structural innovation, and student-centered design—and offers an example of how universities can modernize existing facilities to accommodate evolving academic needs.

