Video: UC Berkeley’s Grimes Engineering Center showcases adaptive reuse and seismic innovation

Designed by Skidmore, Owings & Merrill, the transformed engineering center combines a 35,570-square-foot expansion with sustainable design, earthquake resilience, and collaborative spaces for students.

The University of California, Berkeley’s Grimes Engineering Center demonstrates how adaptive reuse can transform an aging campus facility into a modern hub for learning, collaboration, and innovation.

Designed by Skidmore, Owings & Merrill (SOM), the project reimagines the original 1980 Bechtel Engineering Center by incorporating a two-story glass-and-steel pavilion above the existing structure. The renovation and expansion preserve much of the original building while introducing light-filled gathering spaces, student services, and flexible areas for academic and community activities.

The project also incorporates an innovative seismic-resilience system using shape-memory alloy cables designed to help the structure recover its position following an earthquake. By retaining and repurposing existing building components, the design achieved a more than 42% reduction in embodied carbon emissions compared with a comparable demolition-and-new-construction approach.

Explore how the Grimes Engineering Center, completed in 2025, brings together sustainable campus planning, structural innovation, and student-centered design—and offers an example of how universities can modernize existing facilities to accommodate evolving academic needs.

Sign up for our eNewsletters
Get the latest news and updates